What projects can be approved by the Building Department without Town of Moraga approval?

Most building permit applications for termite repair work, re-roofing, solar panel installations on existing roofs and interior remodeling, where no exterior changes to the walls or windows are proposed and where the size of an existing garage will not be modified, may be taken directly to the Contra Costa County Building Department. However, if the work exceeds the Town’s thresholds for recycling construction and demolition materials, then an applicant will need to submit a recycling deposit with the Town prior to applying for a building permit. For, example any re-roofing project for a roof larger than 1,000 square feet (10 squares), would required a recycling deposit.

Reconstruction of a rotten deck will require pictures of the existing deck and the deck cannot be expanded or additional posts added without Town approval.

Show All Answers

1. When do I need a building permit?
2. Where is the Building Department located?
3. What projects can be approved by the Building Department without Town of Moraga approval?
4. Can the windows in my home be replaced without prior Town approval?
5. What permits are required in order to change or widen my driveway?
6. Do I need a permit to build a fence?