Town Of Moraga

Storm Drain Master Plan

A presentation was made at the January 14 Town Council meeting to provide an update on the Storm Drain Master Plan (SDMP) project. To date, the project has mapped the Town’s storm drain system and provided condition assessment and televising on a sample of the Town’s pipelines. Candidate streets for the upcoming 2015 Pavement Repair project were further studied with a determination to repair underlying damaged pipelines as part of the paving project to prevent cutting into newly paved roads. The last steps are to study the creeks and their culverts; to develop a hydrology and hydraulics model of the Town’s storm drain system; and to develop capital costs for improvements as shown at SDMP presentation.

Tell A Friend

Tell a Friend

Send an email to a friend about this particular item you have read about on the Town of Moraga's website.


From:

Your Name

Your Email Address

To:

Friend Email Address

Friend Email Address

Friend Email Address

Friend Email Address

Friend Message

 


Captcha Image

 

go back