Town Of Moraga

Joint Moraga-Orinda Pavement Project – November 2018

The following streets will be reconstructed with a Full Depth Reclamation (FDR) treatment: (1) Tharp Drive (Camino Pablo to northeast end); (2) Ascot Drive (Ascot Court to 2084 Ascot Drive) and (3) Crossbrook Drive (Greenfield Drive to north end). FDR is a rehabilitation technique in which the existing pavement is pulverized and blended with cement to provide a stronger, homogeneous material. The final surface of the streets will be paved with asphalt incorporated with recycled rubber from tires through a CalRecycle grant. The pulverizing on Wednesday, October 24 on Tharp Drive, Monday, October 29 on Crossbrook Drive, and November 1 on Ascot Drive, contingent on weather conditions. To learn more about the project and stay up-to-date on any changes to the schedule, visit the Town's Pavement Program webpage. For daily construction activities, please follow the Moraga Measure K Facebook page.

Tell A Friend

go back